K sequence Parallel Shaft-CZPTcal Geared Motor Traits
one. Features:
- Higher efficiency: ninety two%-93%
- Vertical output, compact construction, tough tooth area , huge output torque, reduced noise and long support existence.
- High precision: the equipment is manufactured of substantial-good quality alloy steel forging, carbonitriding and hardening therapy, grinding approach to guarantee high precision and stable managing.
- High interchangeability: highly modular, serial design and style, robust flexibility and interchangeability.
2. CZPT parameters
Ratio | 5.36-197.37 |
Enter energy | .twelve-200KW |
Output torque | 10-62800N.m |
Output speed | seven-415rpm |
Mounting kind | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Approach | Flange input(AM), shaft enter(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Release | HF-handbook launch(lock in the brake launch situation), HR-guide launch(autom-atic braking situation) |
Thermistor | TF(Thermistor protection PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Type | K37-K157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing content | HT200 higher-toughness solid iron from R37,47,57,67,77,87 |
Housing materials | HT250 Large toughness forged iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment |
Single Stage Effectiveness | up to 96% |
Lubricant | VG220 |
Safety Class | IP55, F class |
CZPTshine Push
ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a condition-owned navy mould business, was set up in 1965. CZPTshine specializes in the complete electricity transmission solution for higher-finish products production industries based on the goal of “System Merchandise, Application Design and style and Skilled Support”.
CZPTshine have a strong technical pressure with over 350 employees at current, including in excess of thirty engineering professionals, thirty high quality inspectors, covering an spot of 80000 sq. meters and types of superior processing equipment and tests equipments. We have a very good foundation for the industry application advancement and service of high-finish velocity reducers & variators proudly owning to the provincial engineering technology analysis middle,the lab of gear velocity reducers, and the foundation of present day R&D.
Our Crew
Top quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
seven. Certification.
All our goods get ISO & CE & UL certification.
Packing
Delivery