This variety of motor adopts modular style, the entire equipment is divided into torque motor. Eddy existing brake, electromagnetic brake, enthusiast four massive modules, according to the user’s demands and utilizing a mixture of different functions need to have to be configured.
software:
This sort of motor is mainly employed for automobile shift gear push tower crane. Also commonly utilized in other horizontal velocity of all kinds of equipment. Such as port construction, metallurgy, lifting, wire and cable, plastics, printing and dyeing, textile, paper making industries.
main technical parameters:
Design | Rated Torque (N.m) | Rated Present (A) | Brake Torque (N.m) | Synchro-Speed (r/min) | Fat (kg) |
YTLEJ112L-55-four | fifty five | 24 | 35 | 1500/1800 | 85 |
YTLEJ112L-sixty five-four | sixty five | 26 | 35 | 85 | |
YTLEJ112L-seventy five-four | seventy five | 30 | 35 | ninety | |
YTLEJ112L-95-4 | 95 | 34 | 40 | 100 | |
YTLEJ112L-a hundred and twenty-4 | 120 | 40 | forty | 105 | |
YTLEJ112L-one hundred forty five-four | a hundred forty five | fifty four | 80 | 138 | |
YTLEJ112L-155-4 | a hundred and fifty five | fifty eight | 80 | 138 | |
YTLEJ112L-185-4 | 185 | sixty eight | eighty | 148 | |
YTLEJ112L-fifty five-six | 55 | sixteen | 35 | one thousand/1200 | ninety |
YTLEJ112L-65-six | sixty five | 19 | 35 | ninety | |
YTLEJ112L-75-6 | seventy five | 21 | 35 | one zero five | |
YTLEJ112L-95-six | ninety five | twenty five | 40 | a hundred and five | |
YTLEJ112L-one hundred twenty-six | one hundred twenty | 30 | forty | one hundred fifteen | |
YTLEJ112L-145-6 | one hundred forty five | forty five | 80 | one hundred forty | |
YTLEJ112L-one hundred fifty five-6 | a hundred and fifty five | fifty | eighty | one hundred forty | |
YTLEJ112L-185-6 | 185 | 65 | eighty | a hundred and fifty five | |
YTLEJ112L-sixty five-four-four/2 | 65/38 | 26/36 | forty | 1500/3000 | ninety |
FAQ new and speak to
Q: Are you investing business or manufacturer ?
A: We are trading business, but we have extremely good and long term cooperations with several major makers in tower crane and passenger hoist area in China.
Q: How lengthy is your shipping and delivery time?
A: CZPTly it is five-10 days if the items are in stock. or it is 15-20 times if the goods are not in inventory, it is according to the product group and quantity.
Q: Do you supply samples ?
A: In this area, we rarely supply samples, but it depands.
Q: What is your conditions of payment ?
We do TT most, but we can also do L/C and west union for you.
If you have yet another query, pls really feel cost-free to make contact with us as below: